View and analyze meter consumption data
| Index Number | Cabinet | Label | Start / End Readings | Description | Status | Latest Consumption |
|---|---|---|---|---|---|---|
| SDB-2.F-VRV | S-1.5 |
Start:
89,814.12
kWh
End:
90,064.50
kWh
|
Coverage: 2nd floor the area โฆ
|
Active |
250.38
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-2.F-VRV | S-2.3 |
Start:
99,231.05
kWh
End:
99,702.18
kWh
|
Air conditioners for 2nd flooโฆ
|
Active |
471.13
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-2.F-VRV | S-2.2 |
Start:
25,607.43
kWh
End:
25,750.63
kWh
|
Air conditioners on 2nd floorโฆ
|
Active |
143.20
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-4.F-VRV | S-4.1 |
Start:
74,281.18
kWh
End:
74,905.71
kWh
|
Air conditioners for 4th flooโฆ
|
Active |
624.53
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-4.F-VRV | S-4.2 |
Start:
48,505.25
kWh
End:
49,044.83
kWh
|
Air conditioners for 4th flooโฆ
|
Active |
539.58
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-4.F-VRV | S-4.3 |
Start:
44,544.08
kWh
End:
45,239.43
kWh
|
Air conditioners for followinโฆ
|
Active |
695.35
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-5.F-VRV | S-5.1 |
Start:
140,053.09
kWh
End:
141,278.38
kWh
|
Air conditioners for 5th flooโฆ
|
Active |
1,225.29
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-5.F-VRV | S-5.2 |
Start:
96,843.56
kWh
End:
96,954.09
kWh
|
Air conditioners for 5th flooโฆ
|
Active |
110.52
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-5.F-VRV | S-5.3 |
Start:
73,060.24
kWh
End:
73,972.54
kWh
|
Air conditioners for followinโฆ
|
Active |
912.31
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F-VRV | S-6.1 |
Start:
111,078.09
kWh
End:
112,372.77
kWh
|
Air conditioners for 6th flooโฆ
|
Active |
1,294.68
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F-VRV | S-6.2 |
Start:
82,141.70
kWh
End:
82,799.13
kWh
|
Air conditioners on 6th floorโฆ
|
Active |
657.43
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F-VRV | S-6.3 |
Start:
89,754.22
kWh
End:
90,632.12
kWh
|
Air conditioners for followinโฆ
|
Active |
877.90
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F-VRV | S-7.1 |
Start:
212,900.94
kWh
End:
214,898.25
kWh
|
Air conditioners on 7th floorโฆ
|
Active |
1,997.31
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F-VRV | S-7.2 |
Start:
90,712.27
kWh
End:
91,126.61
kWh
|
Air conditioners on 7th floorโฆ
|
Active |
414.34
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F-VRV | S-7.3.1 |
Start:
95,619.65
kWh
End:
95,939.54
kWh
|
Air conditioners on the 7th fโฆ
|
Active |
319.88
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F-VRV | S-7.3.2 |
Start:
80,428.88
kWh
End:
80,726.91
kWh
|
Air conditioners on the 7th fโฆ
|
Active |
298.03
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F-VRV | S-1.2 |
Start:
238,499.80
kWh
End:
238,997.05
kWh
|
2 air conditioners on the ceiโฆ
|
Active |
497.25
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F-VRV | S-0.2 |
Start:
15,928.14
kWh
End:
15,971.57
kWh
|
Air conditioners in the lobbyโฆ
|
Active |
43.43
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F-VRV | S-0.1 |
Start:
173,135.98
kWh
End:
174,207.42
kWh
|
3 air conditioners in tourismโฆ
|
Active |
1,071.44
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F-VRV | S-0.4 |
Start:
230,548.42
kWh
End:
231,812.50
kWh
|
Main entrance plus one unit iโฆ
|
Active |
1,264.07
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F-VRV | S-0.3 |
Start:
36,473.71
kWh
End:
36,580.49
kWh
|
Air conditioners of Multifuncโฆ
|
Active |
106.78
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F-VRV | S-0.5 |
Start:
28,984.66
kWh
End:
29,059.28
kWh
|
Air conditioners of ground flโฆ
|
Active |
74.62
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F-VRV | S-1.4 |
Start:
8,108.37
kWh
End:
8,153.60
kWh
|
Air conditioners in library oโฆ
|
Active |
45.23
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F-VRV | S-1.3 |
Start:
9,125.29
kWh
End:
9,162.80
kWh
|
Air conditioners in library oโฆ
|
Active |
37.51
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F-VRV | S-1.1 |
Start:
52,495.17
kWh
End:
52,722.06
kWh
|
Air conditioners near the winโฆ
|
Active |
226.89
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F-VRV | S-2.1 |
Start:
61,494.77
kWh
End:
61,770.47
kWh
|
Air conditioners next to the โฆ
|
Active |
275.70
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-3.F-VRV | S-3.1 |
Start:
154,476.70
kWh
End:
155,395.19
kWh
|
1/3 of 3rd floor
|
Active |
918.49
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-3.F-VRV | S-3.2 |
Start:
112,188.80
kWh
End:
113,805.89
kWh
|
1/3 of 3rd floor
|
Active |
1,617.09
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-3.F-VRV | S-3.3 |
Start:
152,473.45
kWh
End:
153,254.14
kWh
|
1/3 of 3rd floor
|
Active |
780.69
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-3.F-VRV | S-3.4 |
Start:
20,728.26
kWh
End:
20,883.97
kWh
|
Mr.Zhang apartment and LDS meโฆ
|
Active |
155.71
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-3.F-VRV | SISTEM-EP |
Start:
7,136.81
kWh
End:
7,176.45
kWh
|
Inverter air conditioner in tโฆ
|
Active |
39.64
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS5 | K-8.1 |
Start:
14,432.53
kWh
End:
14,561.70
kWh
|
Atrium Fresh Air
|
Active |
129.17
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS5 | K-8.2 |
Start:
14,385.08
kWh
End:
14,516.51
kWh
|
Atrium Fresh Air
|
Active |
131.43
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS5 | K-2.2/E-2.2.X |
Start:
278,520.01
kWh
End:
282,522.24
kWh
|
Kitchen 2nd floor/Ventilationโฆ
|
Active |
4,002.23
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS5 | K-3/E-1/V-8.3-E-8.3 |
Start:
78,700.60
kWh
End:
79,921.32
kWh
|
Technical rooms on 0F,1F,2F
|
Active |
1,220.72
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS5 | K-7.2/E-7.1 |
Start:
45,404.19
kWh
End:
45,839.95
kWh
|
Kitchen 7F/Printer room ventiโฆ
|
Active |
435.77
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS6 | K-7.1 |
Start:
207,200.84
kWh
End:
212,107.62
kWh
|
Half of the 7 floor and same โฆ
|
Active |
4,906.79
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS6 | K-1.3 |
Start:
5,035.94
kWh
End:
5,190.37
kWh
|
Fresh air for kitchen on 1st โฆ
|
Active |
154.43
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-1/E-2 |
Start:
28,786.35
kWh
End:
28,930.12
kWh
|
LDS hotel reception on 0 flooโฆ
|
Active |
143.77
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-2 |
Start:
13,171.92
kWh
End:
13,269.38
kWh
|
Multifunctional hall on 0 floโฆ
|
Active |
97.46
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-1.1 |
Start:
3,408.25
kWh
End:
3,450.08
kWh
|
Library on 1st floor
|
Active |
41.83
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-1.2 |
Start:
12,898.53
kWh
End:
12,998.87
kWh
|
Amphitheatre on 1st floor
|
Active |
100.33
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-2.1 |
Start:
86,687.89
kWh
End:
87,375.92
kWh
|
Offices and restaurant VIP roโฆ
|
Active |
688.03
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-4.1 |
Start:
74,548.14
kWh
End:
75,330.50
kWh
|
Entire 4th floor
|
Active |
782.36
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-5.1 |
Start:
141,318.93
kWh
End:
142,220.47
kWh
|
Entire 5th floor
|
Active |
901.54
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-3.1 |
Start:
98,857.52
kWh
End:
98,947.03
kWh
|
Hotel on 3rd floor
|
Active |
89.50
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS4 | K-6.1 |
Start:
137,959.68
kWh
End:
139,035.33
kWh
|
Half of the 7th floor and samโฆ
|
Active |
1,075.65
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-6.F | P1/DBA-6F-1 |
Start:
40,155.10
kWh
End:
40,516.10
kWh
|
Office 605,606 and entire Busโฆ
|
Active |
361.00
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-6.F | P2/DBA-6F-2 |
Start:
2,919.62
kWh
End:
2,986.82
kWh
|
Entire left side of dormitoryโฆ
|
Active |
67.20
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-6.F | P3/DBA-6F-3 | No data |
Office 603
|
Active | No data | |
| SDBA-6.F | P4/DBA-6F-4 |
Start:
4,197.73
kWh
End:
4,312.27
kWh
|
Entire Qianfang Apartments onโฆ
|
Active |
114.54
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-6.F | P5/DBA-6F-CC |
Start:
20,316.92
kWh
End:
20,732.22
kWh
|
Electricity in hallway on 6thโฆ
|
Active |
415.30
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-6.F/1 | SDBA-6.F/1 - 601 |
Start:
2,036.17
kWh
End:
2,109.39
kWh
|
Office 601
|
Active |
73.22
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-6.F/1 | SDBA-6.F/1 - 602 |
Start:
14,079.51
kWh
End:
14,664.03
kWh
|
Office 602
|
Active |
584.53
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-6.F/1 | SDBA-6.F/1-604 |
Start:
826.00
kWh
End:
854.54
kWh
|
Office 604
|
Active |
28.54
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F | P1/DB-6F-1 |
Start:
2,308.31
kWh
End:
2,328.91
kWh
|
Offices 605, 606 and entire Bโฆ
|
Active |
20.60
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F | P2/DB-6F-2 |
Start:
403.49
kWh
End:
413.26
kWh
|
Entire left apartments on 6thโฆ
|
Active |
9.77
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F | P3/DB-6F-3 |
Start:
86.03
kWh
End:
90.86
kWh
|
Office 603
|
Active |
4.83
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F | DB-6F-4 |
Start:
375.21
kWh
End:
387.41
kWh
|
Entire Qianfang Apartments onโฆ
|
Active |
12.20
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F | P5/DB-6F-CC |
Start:
17,903.45
kWh
End:
18,331.13
kWh
|
Electricity in a hallway on 6โฆ
|
Active |
427.68
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F/1 | SDB-6.F/1-601 |
Start:
2,206.68
kWh
End:
2,318.25
kWh
|
Office 601
|
Active |
111.57
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F/1 | SDB-6.F/1-602 |
Start:
6,223.91
kWh
End:
6,496.48
kWh
|
Office 602
|
Active |
272.57
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-6.F/1 | SDB-6.F/1-604 |
Start:
1,894.84
kWh
End:
1,986.13
kWh
|
Office 604
|
Active |
91.28
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F | P1/DB-7F-1 |
Start:
61,983.34
kWh
End:
62,662.74
kWh
|
Coffee machine area, 704,705,โฆ
|
Active |
679.40
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F | P2/DB-7F-2 |
Start:
36,121.53
kWh
End:
36,606.13
kWh
|
Offices 713, 714, 715, 716, 7โฆ
|
Active |
484.60
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F | P3/DB-7F-3 |
Start:
14,176.23
kWh
End:
14,404.27
kWh
|
Offices 717(meeting room), 71โฆ
|
Active |
228.03
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F | P4/DB-7F-4 |
Start:
34,924.92
kWh
End:
35,703.86
kWh
|
701, 702, Regular Employees Dโฆ
|
Active |
778.94
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F | P5/DB-7F-CC |
Start:
6,464.23
kWh
End:
6,503.84
kWh
|
Electricity in the hallway, 7โฆ
|
Active |
39.61
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-7.F | P6/DB-7F-KC |
Start:
93,761.34
kWh
End:
95,246.42
kWh
|
Electricity in the kitchen onโฆ
|
Active |
1,485.08
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-7.F | P1/DBA-7F-1 |
Start:
2,294.13
kWh
End:
2,328.54
kWh
|
Coffee machine area, 704,705,โฆ
|
Active |
34.41
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-7.F | P2/DBA-7F-2 |
Start:
3,145.35
kWh
End:
3,210.96
kWh
|
713, 714, 715, 716, 717 - Ligโฆ
|
Active |
65.62
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-7.F | P3/DBA-7F-3 |
Start:
2,795.01
kWh
End:
2,824.26
kWh
|
Offices 717(meeting room), 71โฆ
|
Active |
29.24
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-7.F | P4/DBA-7F-4 |
Start:
234.46
kWh
End:
234.46
kWh
|
701, 702, Regular Employees Dโฆ
|
Active | No data | |
| SDBA-7.F | P5/DBA-7F-CC |
Start:
27,680.40
kWh
End:
28,085.86
kWh
|
Electricity in the hallway, 7โฆ
|
Active |
405.46
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-4.F | P1/DBA-4F-1 |
Start:
2,651.60
kWh
End:
2,819.71
kWh
|
Office 401
|
Active |
168.11
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-4.F | P2/DBA-4F-2 |
Start:
1,658.70
kWh
End:
1,701.41
kWh
|
Office 407A
|
Active |
42.71
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-4.F | P3/DBA-4F-3 |
Start:
10,020.54
kWh
End:
10,310.72
kWh
|
Office 403
|
Active |
290.19
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-4.F | P4/DBA-4F-4 |
Start:
4,522.84
kWh
End:
4,591.64
kWh
|
Office 402
|
Active |
68.80
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-4.F | P5/DBA-4F-CC |
Start:
16,319.30
kWh
End:
16,661.35
kWh
|
Entire hallway on 4th floor
|
Active |
342.05
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-4.F | P1/DB-4F-1 |
Start:
416.02
kWh
End:
443.39
kWh
|
Office 401
|
Active |
27.37
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-4.F | P2/DB-4F-2 |
Start:
259.35
kWh
End:
267.97
kWh
|
Office 407A
|
Active |
8.61
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-4.F | P3/DB-4F-3 |
Start:
1,703.81
kWh
End:
1,739.76
kWh
|
Office 403
|
Active |
35.95
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-4.F | P4/DB-4F-4 |
Start:
474.28
kWh
End:
476.06
kWh
|
Office 402
|
Active |
1.78
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-4.F | P5/DB-4F-CC |
Start:
10,096.14
kWh
End:
10,245.30
kWh
|
Entire hallway on 4th floor
|
Active |
149.16
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-5.F | P1/DB-5F-1 |
Start:
550.01
kWh
End:
551.59
kWh
|
Office 501
|
Active |
1.58
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-5.F | P2/DB-5F-2 |
Start:
793.27
kWh
End:
818.14
kWh
|
Office 503
|
Active |
24.88
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-5.F | P3/DB-5F-3 |
Start:
108.63
kWh
End:
110.66
kWh
|
Office 502
|
Active |
2.03
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-5.F | P4/DB-5F-4 |
Start:
311.24
kWh
End:
313.23
kWh
|
Office 504
|
Active |
1.99
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-5.F | P5/DB-5F-CC |
Start:
16,017.38
kWh
End:
16,257.83
kWh
|
Entire hallway on 5th floor
|
Active |
240.45
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-5.F | P1/DBA-5F-1 |
Start:
2,650.31
kWh
End:
2,674.33
kWh
|
Office 501
|
Active |
24.02
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-5.F | P2/DBA-5F-2 |
Start:
4,783.96
kWh
End:
4,901.30
kWh
|
Office 503
|
Active |
117.34
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-5.F | P3/DBA-5F-3 |
Start:
4,424.57
kWh
End:
4,483.50
kWh
|
Office 502
|
Active |
58.93
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-5.F | P4/DBA-5F-4 |
Start:
4,450.17
kWh
End:
4,463.50
kWh
|
Office 504
|
Active |
13.34
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-5.F | P5/DBA-5F-CC |
Start:
19,897.72
kWh
End:
20,216.52
kWh
|
Hallway on 5th floor
|
Active |
318.80
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F | DB-1.F-OF |
Start:
33,744.87
kWh
End:
34,188.53
kWh
|
Offices Cultural Center
|
Active |
443.66
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F | DB-1.F-RR |
Start:
10,424.56
kWh
End:
10,593.51
kWh
|
Library in Cultural Center
|
Active |
168.95
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F | DB-1.F-CC |
Start:
124.34
kWh
End:
136.21
kWh
|
Cultural Center
|
Active |
11.87
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F | DB-1.F-KC |
Start:
63.98
kWh
End:
66.81
kWh
|
Kitchen on 1st floor
|
Active |
2.83
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.F | DB-1.F-K |
Start:
1.16
kWh
End:
1.16
kWh
|
Inactive
|
Active | No data | |
| SDBA-1.F | DBA-1.F-OF |
Start:
3,488.02
kWh
End:
3,540.41
kWh
|
Offices on 1st floor of Cultuโฆ
|
Active |
52.39
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-1.F | DBA-1.F-RR |
Start:
3,965.74
kWh
End:
4,060.87
kWh
|
Library on 1st floor of Cultuโฆ
|
Active |
95.13
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-1.F | DBA-1.F-CC |
Start:
30.80
kWh
End:
30.83
kWh
|
Cultural Center
|
Active |
0.04
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-1.F | DBA-1.F-KC |
Start:
18,645.23
kWh
End:
18,866.56
kWh
|
Kitchen on 1st floor of Cultuโฆ
|
Active |
221.33
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-2.F | DB-2.F-OF |
Start:
1,319.55
kWh
End:
1,359.68
kWh
|
Office area on 2nd floor
|
Active |
40.13
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-2.F | DB-2.F-RES |
Start:
17,710.49
kWh
End:
17,973.65
kWh
|
Restaurant area and kitchen oโฆ
|
Active |
263.16
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-2.F | DB-2.F-CC |
Start:
10,470.20
kWh
End:
10,656.32
kWh
|
Hallways on 2nd floor
|
Active |
186.12
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-2.F | DBA-2.F-OF |
Start:
7,817.41
kWh
End:
7,922.25
kWh
|
Office area on 2nd floor
|
Active |
104.84
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-2.F | DBA-2.F-RES |
Start:
69,343.65
kWh
End:
70,557.78
kWh
|
Restaurant area and kitchen oโฆ
|
Active |
1,214.13
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-2.F | DBA-2.F-CC |
Start:
26,143.97
kWh
End:
26,471.19
kWh
|
Hallways on 2nd floor
|
Active |
327.22
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-3.F | DBA-3F-CC |
Start:
73,941.25
kWh
End:
75,193.53
kWh
|
Hallways on entire 3rd floor
|
Active |
1,252.27
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-G.F | DBA-GF-CC1 |
Start:
38,758.85
kWh
End:
39,406.24
kWh
|
Half of the 0 floor of Culturโฆ
|
Active |
647.38
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-G.F | DBA-GF-CC2 |
Start:
59,431.43
kWh
End:
60,458.07
kWh
|
Half of the Cultural Center oโฆ
|
Active |
1,026.64
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDBA-G.F | DBA-GF-SS |
Start:
1,255.46
kWh
End:
1,255.46
kWh
|
Security room on 0 floor
|
Active | No data | |
| SDBA-G.F | DBA-GF-MH |
Start:
53,200.13
kWh
End:
54,306.97
kWh
|
Multifunctional hall on 0 floโฆ
|
Active |
1,106.84
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F | DB-GF-CC1 |
Start:
83,755.11
kWh
End:
84,340.96
kWh
|
Half of the 0 floor of Culturโฆ
|
Active |
585.85
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F | DB-GF-CC2 |
Start:
82,730.27
kWh
End:
83,658.37
kWh
|
Half of the 0 floor of Culturโฆ
|
Active |
928.11
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-G.F | DB-GF-MH |
Start:
1,111.78
kWh
End:
1,151.56
kWh
|
Multifunctional Hall on 0 floโฆ
|
Active |
39.78
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-2.G-MS7 | P1-DB-2.G-MS7 |
Start:
1,533.02
kWh
End:
1,541.31
kWh
|
Ventilation in garrage
|
Active |
8.29
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.G-VRV | G-1.2 |
Start:
23,584.05
kWh
End:
23,626.69
kWh
|
Air Conditioners in garrage
|
Active |
42.64
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.G-VRV | G-1.1 |
Start:
35,649.81
kWh
End:
35,977.67
kWh
|
Air conditioners in garrage
|
Active |
327.86
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| SDB-1.G-VRV | G-2 |
Start:
61,644.08
kWh
End:
62,681.49
kWh
|
Air conditioners in garrage
|
Active |
1,037.41
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-1.G-MS2 | V-1/V-4/E-4/E-5 |
Start:
136,444.00
kWh
End:
136,503.31
kWh
|
Fresh air in garage and ventiโฆ
|
Active |
59.31
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P2/DB-APII-01 |
Start:
38,752.78
kWh
End:
39,136.96
kWh
|
G3 1st floor-left apartment
|
Active |
384.18
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P3/DB-APII-02 |
Start:
66,107.49
kWh
End:
66,861.99
kWh
|
Gate 3, 1st floor right apartโฆ
|
Active |
754.49
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P4/DB-APII-03 |
Start:
2,019.60
kWh
End:
2,036.06
kWh
|
Gate 3, 2nd floor left apartmโฆ
|
Active |
16.47
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P5/DB-APII-04 |
Start:
16,304.07
kWh
End:
16,501.06
kWh
|
G3, 2nd floor right apartment
|
Active |
197.00
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P6/DB-APII-05 |
Start:
51,845.56
kWh
End:
52,200.08
kWh
|
G3, 3rd floor left apartment
|
Active |
354.52
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P7/DB-APII-06 |
Start:
16,207.80
kWh
End:
16,650.53
kWh
|
G3, 3rd floor, right apartment
|
Active |
442.73
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P8/DB-APII-07 |
Start:
11,192.37
kWh
End:
11,722.71
kWh
|
G3, 4th floor left apartment
|
Active |
530.34
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P9/DB-APII-08 |
Start:
68,649.12
kWh
End:
69,258.31
kWh
|
G3, 4th floor, right apartment
|
Active |
609.19
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P10/DB-APII-GYM |
Start:
24,738.77
kWh
End:
25,229.03
kWh
|
G3, 5th floor left apartment
|
Active |
490.27
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P11/DB-APII-09 |
Start:
57,486.17
kWh
End:
58,127.23
kWh
|
G3 5th floor right apartment
|
Active |
641.07
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P12/DB-APII-10 |
Start:
39,310.07
kWh
End:
39,989.44
kWh
|
G3 6th floor, left apartment
|
Active |
679.37
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P13/DB-APII-11 |
Start:
55,946.19
kWh
End:
56,762.45
kWh
|
G3 6th floor right apartment
|
Active |
816.26
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P14/DB-APII-12 |
Start:
75,231.12
kWh
End:
75,592.01
kWh
|
G3 7th floor left apartment
|
Active |
360.89
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P15/DB-APII-13 |
Start:
59,285.55
kWh
End:
59,891.19
kWh
|
G3 7th floor right apartment
|
Active |
605.64
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P16/DB-API-01 |
Start:
51,044.83
kWh
End:
51,593.95
kWh
|
G5, G floor first apartment
|
Active |
549.11
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P17/DB-API-02 |
Start:
22,168.85
kWh
End:
22,512.71
kWh
|
G5, G floor 2nd apartment
|
Active |
343.86
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P18/DB-API-03 |
Start:
41,302.32
kWh
End:
41,483.30
kWh
|
G5 2nd floor apartment
|
Active |
180.98
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P19/DB-API-04 |
Start:
34,830.09
kWh
End:
35,820.39
kWh
|
G5 3rd floor apartment
|
Active |
990.30
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P20/DB-API-05 |
Start:
22,714.13
kWh
End:
22,878.38
kWh
|
G5 4th floor apartment
|
Active |
164.25
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| MDB-AP | P21/DB-API-06 |
Start:
19,773.85
kWh
End:
20,028.20
kWh
|
G5 5th floor apartment
|
Active |
254.35
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 411 |
Start:
5,996.06
kWh
End:
6,037.23
kWh
|
Office 411
|
Active |
41.17
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 404 |
Start:
5,309.53
kWh
End:
5,535.51
kWh
|
Office 404
|
Active |
225.98
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 406 |
Start:
3,806.00
kWh
End:
3,873.44
kWh
|
Office 406
|
Active |
67.44
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 405 |
Start:
6,553.36
kWh
End:
6,712.55
kWh
|
Office 405
|
Active |
159.20
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 407 |
Start:
4,502.62
kWh
End:
4,642.55
kWh
|
Office 407
|
Active |
139.93
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 409 |
Start:
4,847.33
kWh
End:
4,886.49
kWh
|
Office 409
|
Active |
39.16
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 408 |
Start:
703.18
kWh
End:
718.02
kWh
|
Office 408
|
Active |
14.84
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 411-A |
Start:
3,957.75
kWh
End:
4,005.48
kWh
|
Office 411
|
Active |
47.72
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 405-A |
Start:
1,556.00
kWh
End:
1,587.06
kWh
|
Office 405
|
Active |
31.05
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 406-A |
Start:
908.15
kWh
End:
951.85
kWh
|
Office 406
|
Active |
43.70
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 407-A |
Start:
3,672.08
kWh
End:
3,743.20
kWh
|
Office 407
|
Active |
71.11
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 409-A |
Start:
1,170.97
kWh
End:
1,183.16
kWh
|
Office 409
|
Active |
12.19
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 408-A |
Start:
471.42
kWh
End:
481.39
kWh
|
Office 408
|
Active |
9.97
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 404-A |
Start:
4,080.67
kWh
End:
4,129.90
kWh
|
Office 404
|
Active |
49.23
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | ROOMS |
Start:
2,000.35
kWh
End:
2,043.83
kWh
|
Electricity for every room inโฆ
|
Active |
43.49
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 505 |
Start:
5,693.09
kWh
End:
5,855.28
kWh
|
Office 505
|
Active |
162.19
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 508 |
Start:
15,994.01
kWh
End:
16,013.13
kWh
|
Office 508
|
Active |
19.12
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-MREZA | 507 |
Start:
8,507.37
kWh
End:
8,626.30
kWh
|
Office 507
|
Active |
118.93
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 508-A |
Start:
4,639.63
kWh
End:
4,657.40
kWh
|
Office 508
|
Active |
17.77
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 507-A |
Start:
6,585.30
kWh
End:
6,709.58
kWh
|
Office 507
|
Active |
124.28
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| RO-AGREGAT | 505-A |
Start:
6,066.28
kWh
End:
6,245.14
kWh
|
Office 505
|
Active |
178.86
kWh
May 2026 (2026-05-01 to 2026-05-31)
|
|
| DB-S.F-MS6 | Cetin-Base Station |
Start:
45,662.03
kWh
End:
48,823.73
kWh
|
Cover consumption of Cetin Baโฆ
|
Active |
3,161.71
kWh
May 2026 (2026-05-01 to 2026-05-31)
|